Building Plot Development & Servicing
The following list of items should be costed for each self build project. This is not an exhaustive list as each project and plot is unique.
- Planning Application fee
- Percolation Testing for proposed septic tank
- Location and site plan by local architect/technician
- Building Warrant Application fee
- Engineer’s Report on the ground condition – may be required by local building control authority
- Water supply including building water and connection charge
- BT connection charge
- Electrical supply
- Trenchwork for above by main contractor
- Road access to site
- Tarring belmouth to main road.
- Septic tank and soakaway
A guide price for the above would be £15,000 to £20,000 for a typical building plot.